Where to view bim service providers

Modeling (BIM) technology in the design and construction sector is the end-to-end integration of several processes: design, construction, and operation.


In the process of BIM DESIGN, by organizing an environment of shared data, group work on a project, you can control and analyze the design process, the cost of materials and equipment, improve the quality of design, eliminating inconsistencies between project sections and data loss.

Defining the goals of using information modeling. Creating a list of tasks to be solved.

The analysis of the existing technological process at the enterprise is performed in order to determine how to most effectively prepare the conditions for the gradual implementation of BIM technology in accordance with the set goals. As a result, a new or modified technological process is proposed, including the organization of data exchange between participants in the design process, collective work on creating an information model, defining the responsibilities (roles) of participants in the BIM process, organizing the shared data environment, file structure, and file naming. Solutions for workplace modernization are proposed. Using the bim service providers strategy the author justifies the selection of programs for creating an information model and its visualization for all participants in the BIM process (Manager, ISU, architect, designer, internal network engineer, VET specialist).

________________________________________

  •  Development of BIM processes in the enterprise
  •  Software for working in BIM technology. The OpenBIM Concept.
  •  Roles and responsibilities of participants in the BIM modeling process.
  •  Checking and analyzing the information model: visual control, navigation, reports, checking for collisions, calculating the volume of materials.

Pilot project as a basis for transition to BIM design

A pilot project is the implementation of a project using information modeling technology by a pilot group (consisting of employees of the Customer's company).

To perform a" trial "BIM project, it is better to use a previously implemented project saved in dwg format (it performs the function of a" comparative " project).

The pilot team for the task of modernizing the design process is selected from specialists in different sections of the project, for example, a BIM Manager, 2 design engineers, an engineer, an electrical engineer.

Pilot group for the task of analyzing the materials used: BIM Manager, design engineer, VET engineer.

Participants of the pilot group acquire skills in working with specialized SOFTWARE for creating information models: architectural, design, engineering networks.

The project summary information model consists of information models of project sections.

The BIM Manager creates and adjusts all BIM regulations and BIM processes during the pilot project implementation.